Project_Jupiter_Evidence_Record.docx
This is a Word document (.docx). Download it to open in Word, Pages, or Google Docs.
What this contains
- The water-balance math: 105M gallons/day in use, ~8.7M/day of cushion, and the 17.9% the data centers would take.
- The power/load analysis: 2,300 MW supply vs. 2,173 MW peak, and the 127 MW cushion against ~250 MW of new demand.
- A timeline of the El Paso / Doña Ana data-center cluster (Meta, Wiwynn, Project Jupiter).
- An index of 68 public records — every figure on the site is traceable to a primary source.
- Written to be reproducible: show a better source and the number gets corrected.